There is a standard, relatively simple practice to drilling for coalbed natural gas. An outline of the process from initial surveying to water discharge is a helpful tool.
Overview of Development
- Introduction to Operator
- Steps to take before development occurs
- Going over your ranch plan
- Voicing questions and concerns
- Initial staking and surveying of location
- Drilling the Well(s)
- Initial drilling of well
- Well drilled to top of coal, steel casing set, cemented to surface
- Bit drilled into coal formation, coal is underreamed
- Well cleaned out with fresh water
- Installation
- Motor controller
- Power switch box
- Pipelines
- Water well pump
- Tubing
- Power and Flow Lines Buried
- Gas Transported to Central Meter House and Compressor Station
- Management of Produced Water
- In-channel reservoirs
- Off-channel ponds
- Stock tanks
- Irrigation systems
- Interim Reclamation
- Leveling and seeding of well location and flow/electrical line corridors
- Reclamation as work progresses
- Final Reclamation
- Once water output has ceased, off-channel reservoirs reclaimed
- Roads reclaimed according to landowner specifications
- Wells plugged and abandoned